AFTER PHOTOS

Our clients came to Rochman Design Build with a desire to create a grand kitchen and entertaining space as well as an inviting and spacious screened porch. The home was originally built in 1989 with 2 stories and a walk out basement looking out over a lush ravine in Northeast Ann Arbor. The new kitchen opens up to a gorgeous screened porch where our clients can have their morning coffee, family BBQs, grandchildren sleepovers, and large holiday gatherings. The large island can now hold the plethora of baked Christmas desserts. The downstairs guest room doubles as the exercise room.

Exterior renderings

These renderings from the 3D design model show the new screened porch and outdoor deck projecting out into the trees.

porch rendering

This design rendering shows the inside of the new porch, looking back to the enlarged kitchen.

Exterior ‘before’ photos show the back of the house. The middle level, with screened porch and deck will be removed- these are too small and not open enough. The lower-level storage room will be converted into a basement exercise room. The upper floor will remain as is.

June 20, 2022

Project begins! Brick demolition, screen porch removal, and large shoring structure to hold up the top level.

Existing landscaping and hardscapes are protected during construction. Shoring system is up and downspouts remain to keep water managed.

June 27, 2022

Interior demolition of the existing kitchen begins after a secure temporary wall can be built at the back to protect from the elements.

Meanwhile out back, concrete pier foundations are poured to support the new screened porch and deck structures.

July 14, 2022

 
 

Steel framing being installed. The beams and posts are replacing bearing walls on 2 levels of the house.

 
 

Shoring walls inside the kitchen area support the upper level so we can remove the bearing wall.
A steel beam will be used in this location to hold the weight.

Framing continues.

July 22, 2022

Framing of the main level continues; the new breakfast table area is taking shape.

 
 

Last steel beam being moved into place between the shoring walls.

 
 

Shoring walls come down... What a view this kitchen will have!

August 5, 2022

Framing of the screened porch floor and exterior deck is taking place.

Reworking the ductwork is a big project- lots of heat runs to relocate since we removed several walls.
It looks like the old system had a LOT of runs.

 
 

A temp paint area is set up under the new deck.
Emily is priming and back priming the new exterior siding boards.

 
 

New deck stairs down to grade.

August 19, 2022

The desk is meticulously installed by Zach and Brian.

Meanwhile indoors, the rough electrical and plumbing has been installed.

August 24, 2022

The framing goes up for the screened in porch.

Finished with framing and ready for the finishing touches.

August 31, 2022

The gorgeous ceiling is almost done on the porch; time to build the stairs.

And yes… sometimes you do need to run things by the dog. 😊

September 5, 2022

 
 

On the inside, just before the drywall goes up, we document and photograph where all the mechanical and electrical are run for future reference.

 
 

Four sheet metal “pans” are visible. These will have drywall circles cut out and LED wafer lights installed.

 
 

Inside the kitchen: the drywall is up and being taped.
The two steel beams are visible and will be enclosed with wood.

September 19, 2022

 
 

Mike and Glen meet with our great clients to review the project on a weekly basis.

 
 

Interior rendering from our design process, shows where the work is heading :)

 
 

The basement exercise room got enlarged and is taking shape.

While on the outside, exterior trim is installed on the screened porch.

 
 

Exterior stairs from the porch/deck down to the grade.
New stone steps will connect these to the existing steps and landscaping.

September 30, 2022

 
 

Emily is working on the siding and exterior trim for the screened porch.

Reconfiguring windows in a brick wall. We are changing from 2 smaller windows to one very large window opening. Removal and reusing of the brick is done carefully.

Our amazing masons doing their craft.

 
 

Hardwood floors being installed.

 
 

Staining the outside screened porch.

October 7, 2022

 
 

Emily nails on siding at the lower-level exterior.

 
 

View of screened in porch from below. Almost done!

 
 

New oak flooring in complete and looking gorgeous.

October 14, 2022

 
 

Staining is done.

 
 

And looks beautiful!

 
 

And we think doggy approves.

October 21, 2022

 
 

The cabinet have arrived and kitchen is coming together.

 
 

The pantry wall will provide great storage and also house the refrigerator.

 
 

Temporary bracing holds the island legs in place.

October 28, 2022

 
 

Now that staining is done, Emily is installing the balusters.

 
 

Brian is installing the corner posts for the deck, getting it ready for the railings.

 
 

November 8, 2022

Deck and screened porch are done, time to bring the furniture.

 
 

Meanwhile, in the kitchen, cabinetry is being installed.

November 16, 2022

 
 

Wood on the beams is installed in the kitchen…

 
 

…and in the basement beams too!

 
 

Final cabinet pieces are installed at the island.

 
 

Dave works on the custom media shelves in the basement.

 
 

Media shelves complete and ready for stain.

November 28, 2022

 
 

Built-in banquette nearly complete and waiting for cushions.

 
 

The built-in refrigerator is being installed.

 
 

The wood trim is in progress and nearing completion.

December 7, 2022

 
 

The French doors have arrived and are installed.

 
 

The sound system technician at work.

December 15, 2022

Time to install the windows. 

Meanwhile, outside, the stonework, retaining walls and walkways are all done.

December 21, 2022

Installation of the stunning Brittanicca Quartz by Cambria island countertops in the kitchen.  

December 29, 2022

... Followed by the installation of the gorgeous, Ann Arbor made Motawi tiles in Lichen green.
And on that note, we’re going to wish everyone a happy and joyous holiday season and a beautiful new year!

January 10, 2023

 
 

The island, countertops and backsplash are all in.

 
 

Next, the appliances are going into their permanent home.

 
 

Yep, including the fridge.

 
 

As Zack adds the last piece to enclose the fridge.

January 24, 2023

And we’re done here 😊 
We’ll be back with gorgeous photography, likely in summer - to do the screen porch justice 😉

 
 

And in case you were wondering… Rio totally approves of the new spaces!

EXACT BEFORE AND AFTER PHOTOS