Kitchen Addition: Park Place
Completed April 2023
AFTER PHOTOS
We love making our clients happy and we also love when our work has such a big and positive impact on our clients’ lives that they come back and work with us again. Our first project on this family home was a bathroom remodel. For this project, we will be changing a small and cramped kitchen into a beautiful, family friendly one.
December 9, 2022
For reference, this is the before kitchen.
It’s demolition week 😊
December 15, 2022
With demolition done, the kitchen is down to studs.
Outside, the foundation for the addition is also in full force.
December 29, 2022
Enclosed and all tucked in for the new year.
Wishing you all a sweet and happy new year :-)
January 5, 2023
This is the floor framing for a 4’ x 10 ½’ addition.
There is no mudsill on the existing house,
so an ice and water shield was wrapped around the joists for protection.
January 13, 2023
Our team is preparing for the new steel beam.
The existing structure is being shored up to remove the bearing wall.
New roof structure over the addition.
January 20, 2023
A hole was cut in the wall to get the beam in. In case you’re wondering… the beam weighs 935 lbs
Moving the steel with a mini excavator and using lifts to raise the beam into place.
January 27, 2023
Before finishing out the framing, our team needed to straighten out the ceiling so the cabinets would fit properly. They did that by adding lumber to every piece of ceiling wood to create a straight ceiling.
Electrical and plumbing going in.
Once this is all done, we’ll be ready for insulation.
February 2, 2023
The addition from outside and inside.
All the electrical and plumbing is done.
And the insulation phase of the addition is complete, moving on… 😊
February 10, 2023
It is amazing how easy it is to visualize a completed space once drywall starts going up 😊
February 17, 2023
The new back entry is going to be a game changer!
February 28, 2023
The kitchen is ready for cabinets.
Unpacking and placing where they will be installed.
March 1, 2023
The kitchen cabinets are being installed this week : )
March 14, 2023
Kitchen hardware is installed.
The hood for the range is in.
And the new stairs are getting us closer to the finished back entry.
March 27, 2023
Cabinetry is done, the countertop has been installed as was the backsplash.
And on the outside, the patio staircase is getting a railing.
April 6, 2023
The appliances are installed; we’re almost done here : )
Waiting on some lighting.
April 12, 2023
The island got its beautiful countertop, rounding out the European feel to the kitchen.
It immediately became the favorite for doing high school homework.
The lighting pendants are installed over the glass top table and island.
And we’re out 😊
Thank you to our clients extraordinaire with project #2!