For this basement remodel on this 1973 ranch, located in Ann Arbor Hills, the team at Rochman Design Build will be adding a new access door with a concrete stairwell, replacing the kitchenette with a new kitchen, adding a powder room, and a mudroom area. Please check here often to see the transformation.

March 15, 2021

Digging out for the new stairwell

March 21, 2021

That window will be replaced by the new access door.

March 26, 2021

ready, set, pour

March 30, 2021

The wall dividing the public and private spaces goes up is in place. Ready for rough electrical and then drywall.

April 6, 2021

New plumbing for the new powder room & kitchen island.

Electrical supply to the island is also run before concrete is poured back in the hole.

New Entry door to the basement and the perfect spot for a mudroom!

April 15, 2021

Everything is perfectly placed to be ready for cabinet installed. Then goes in the new concrete!

Framing around stairs and study area are complete.

Ceiling is opening up for new lighting. This will be a bright and welcoming space!

April 22, 2021

New heat & AC vent.

New ducting to exterior for microwave hood vent above new range.

April 30, 2021

Staging for the new stair location, The new entry and doorway cut into the foundation.

May 7, 2021

New powder room walls and new walls at the kitchen location.

New access into existing crawl space at old basement window and existing bath plumbing.
These shots are “pre-drywall” for us to have info on buried mechanicals.

May 15, 2021

210507_448.JPG

Window in existing bath window is above the sink and has a windowell that is covered for protection.

210507_454.JPG

Laundry and mechanical room has a new suspended ceiling.

210507_461.JPG

Drywall arrived!! Yippee :-)

May 20, 2021

210518_404.JPG

This will be an accent wall.

210518_407.JPG

And this will be the new study area.

June 2, 2021

Freshly drywalled and patched wall in the dining / living await paint.
The basement entry with new mudroom.

Red accent wall is just about ready for the slat wall.
The red walls throughout the space make it warm and inviting.

June 10, 2021

The pre-fit slat wall will be taken down for pre-painting.
The kitchen island extensions will support a large counter top over hang.

Kitchen microwave is making its way to a new home.
while in the powder room, we hope this wall-hung vanity in the powder room will not feel too lonely.

June 17, 2021

While the island is getting ready for its countertop, the bathroom sink vanity has gotten its backsplash.

210617_401.JPG

Above ceiling above the panel box is fitted nice and tight, to prevent (as much as one can prevent) all the spiders from descending into the living space – no, we’re not kidding!

June 23, 2021

Filling in the entry gap with cement.

June 30, 2021

And sometimes, explanations are not needed…

July 8, 2021

The kitchen island going in, along with cabinet / storage space.

July 15, 2021

210709_406.JPG

Appliances are going in :-)

210709_409.JPG

Dishwasher in the island, perfect location!

July 22, 2021

Island lighting and sink are installed.

As are the cabinet shelving and stairwell lighting.

July 30, 2021

And we’re done :-)